Novarly ParcelRenewable sites

Renewable sitesCarr Farm (Farm AD)

Carr Farm (Farm AD)

Carr Farm (Farm AD) is an operational 1 MW anaerobic digestion plant in Fylde, generating since 1 January 2010. Planning permission was granted on 6 May 2009, 15 months after submission. Operator of record: Farmgen.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2010
Anaerobic Digestion
Technology
Farmgen
Fylde
Authority
England

Planning and build timeline

Application submitted28 January 2008
Permission granted6 May 2009
15 months after submission
Operational1 January 2010
8 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Fylde: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Carr Farm (Farm AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
52.9 km
Solar Photovoltaics · Operational
54 km
Solar Photovoltaics · Operational
4.94.1 km
Solar Photovoltaics · Operational
3.26.4 km
Battery · Operational
26.8 km
Solar Photovoltaics · Operational
1.36.8 km
Battery · Under Construction
8 km
Solar Photovoltaics · Under Construction
0.78.2 km

How big is Carr Farm (Farm AD)?

Carr Farm (Farm AD) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Carr Farm (Farm AD)?

REPD records the operator as Farmgen. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Carr Farm (Farm AD) approved and built?

The application was submitted on 28 January 2008. Permission was granted on 6 May 2009, 15 months later. The site became operational on 1 January 2010, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 212.