Land Off Ingarsby Lane
Land Off Ingarsby Lane is operational in Harborough with a recorded capacity of 2.1 MW, and has been generating since 2016-06-05.
Planning and build timeline
| Application submitted | 2015-05-14 |
| Permission granted | 2015-07-30 3 months after submission |
| Operational | 2016-06-05 10 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Harborough’s record on solar
Harborough has decided 12 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Harborough →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Harborough Road Store Solar Photovoltaics · Operational | 0.2 | 6.7 km |
Newarke St Car Park - Solar Panels Solar Photovoltaics · Under Construction | — | 9.2 km |
National Space Centre Solar Photovoltaics · Operational | 0.2 | 9.3 km |
Syston Road - Solar Farm Solar Photovoltaics · Under Construction | 26 | 10.8 km |
Severn Trent STW Wind Onshore · Operational | 2.5 | 10.8 km |
Hoods Close - Solar Panels Solar Photovoltaics · Under Construction | 1.7 | 10.9 km |
Pepsico International Limited, Leycroft Road - Solar Panels Solar Photovoltaics · Under Construction | 3.25 | 11.5 km |
Blaby Solar Farm Solar Photovoltaics · Operational | 3.5 | 11.7 km |
How big is Land Off Ingarsby Lane?
Land Off Ingarsby Lane has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land Off Ingarsby Lane?
REPD records the operator as T J Coates Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land Off Ingarsby Lane approved and built?
The application was submitted on 2015-05-14. Permission was granted on 2015-07-30, 3 months later. The site became operational on 2016-06-05, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5316.