Land at Tip Field is a 5 MW solar farm under construction in Sefton. Planning permission was granted on 23 September 2016, 14 months after submission. Operator of record: BE Renewables.
Planning and build timeline
| Application submitted | 29 July 2015 |
| Permission granted | 23 September 2016 14 months after submission |
| Operational | not recorded |
Screening a site of your own?
Sefton approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Land at Tip Field’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Sefton
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Sefton’s record on solar
Sefton has decided 30 solar farms and approved 97%, taking a median of 1.6 months. See every solar farm decision in Sefton →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 5 | 0.4 km |
Solar Photovoltaics · Operational | 0.3 | 2.2 km |
Solar Photovoltaics · Under Construction | 0.63 | 8.8 km |
Wind Onshore · Operational | 3 | 12.1 km |
Battery · Under Construction | — | 12.8 km |
Battery · Under Construction | 20 | 13 km |
Solar Photovoltaics · Operational | 2.5 | 13.3 km |
Battery · Operational | 2 | 13.3 km |
How big is Land at Tip Field?
Land at Tip Field has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land at Tip Field?
REPD records the operator as BE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land at Tip Field approved and built?
The application was submitted on 29 July 2015. Permission was granted on 23 September 2016, 14 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5534.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode