Jemmys Carr is under construction in Sefton with a recorded capacity of 5 MW.
Planning and build timeline
| Application submitted | 2015-08-03 |
| Permission granted | 2016-09-23 14 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Sefton
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Sefton’s record on solar
Sefton has decided 30 solar farms and approved 97%, taking a median of 1.6 months. See every solar farm decision in Sefton →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land at Tip Field Solar Photovoltaics · Under Construction | 5 | 0.4 km |
Ainsdale Wastewater Treatment Works Solar Photovoltaics · Operational | 0.3 | 2.5 km |
Deyes Academy Redevelopment Solar Photovoltaics · Under Construction | 0.63 | 8.7 km |
Royal Seaforth Dock Wind Farm Wind Onshore · Operational | 3 | 11.7 km |
Hawthorne Road Battery · Under Construction | 20 | 12.7 km |
Crossens Pumping Station - Solar Array Battery · Under Construction | — | 13.2 km |
Lathom (Pilkington Technical Centre) Battery Storage Battery · Operational | 2 | 13.5 km |
Lathom (Pilkington Technical Centre) Solar Photovoltaics · Operational | 2.5 | 13.5 km |
How big is Jemmys Carr?
Jemmys Carr has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Jemmys Carr?
REPD records the operator as Beacons Cross Solar (formerly Jemmys Carr Solar). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Jemmys Carr approved and built?
The application was submitted on 2015-08-03. Permission was granted on 2016-09-23, 14 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5938.