Renewable sites › Crossens Pumping Station - Solar Array
Crossens Pumping Station - Solar Array
Crossens Pumping Station - Solar Array is under construction in West Lancashire.
Planning and build timeline
| Application submitted | 2021-08-19 |
| Permission granted | 2022-02-25 6 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Green Belt — West Lancashire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Lancashire’s record on battery storage
West Lancashire has decided 5 battery storage schemes and approved 100%, taking a median of 4.5 months. See every battery storage scheme decision in West Lancashire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Carr Farm (Farm AD) Anaerobic Digestion · Operational | 1 | 8 km |
Cooper House Farm Solar Photovoltaics · Operational | 5 | 10.9 km |
Clifton Marsh Wastewater Treatment Works Solar Photovoltaics · Operational | 3.2 | 10.9 km |
Land off Moss Side Lane Solar Photovoltaics · Operational | 5 | 10.9 km |
Ainsdale Wastewater Treatment Works Solar Photovoltaics · Operational | 0.3 | 11.1 km |
Carver Hay, moss lane Solar Photovoltaics · Operational | 2.5 | 11.2 km |
Clifton Marsh Wastewater Treatment Works Solar Photovoltaics · Operational | 1.3 | 11.3 km |
Clifton Marsh Waste Water Treatment Works Battery · Operational | 2 | 11.5 km |
How big is Crossens Pumping Station - Solar Array?
REPD does not record an installed capacity for Crossens Pumping Station - Solar Array.
Who operates Crossens Pumping Station - Solar Array?
REPD records the operator as Environment Agency. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Crossens Pumping Station - Solar Array approved and built?
The application was submitted on 2021-08-19. Permission was granted on 2022-02-25, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9513.