Ainsdale Wastewater Treatment Works

Ainsdale Wastewater Treatment Works is an operational 0.3 MW solar farm in West Lancashire, generating since 6 September 2019. Planning permission was granted on 15 March 2019, 3 months after submission. Operator of record: United Utilities.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 6 September 2019
Solar Photovoltaics
Technology
United Utilities
West Lancashire
Authority
England

Planning and build timeline

Application submitted18 December 2018
Permission granted15 March 2019
3 months after submission
Operational6 September 2019
6 months after consent

Screening a site of your own?

RedlineUK · £39

West Lancashire approves 77% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ainsdale Wastewater Treatment Works’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Lancashire’s record on solar

West Lancashire has decided 13 solar farms and approved 77%, taking a median of 1.9 months. See every solar farm decision in West Lancashire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
52.2 km
Solar Photovoltaics · Under Construction
52.5 km
Solar Photovoltaics · Under Construction
0.6310.8 km
Battery · Under Construction
11.1 km
Solar Photovoltaics · Operational
2.513.9 km
Battery · Operational
213.9 km
Wind Onshore · Operational
314.2 km

How big is Ainsdale Wastewater Treatment Works?

Ainsdale Wastewater Treatment Works has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ainsdale Wastewater Treatment Works?

REPD records the operator as United Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ainsdale Wastewater Treatment Works approved and built?

The application was submitted on 18 December 2018. Permission was granted on 15 March 2019, 3 months later. The site became operational on 6 September 2019, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7279.