Ainsdale Wastewater Treatment Works is operational in West Lancashire with a recorded capacity of 0.3 MW, and has been generating since 2019-09-06.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-09-06
Solar Photovoltaics
Technology
United Utilities
West Lancashire
Authority
England

Planning and build timeline

Application submitted2018-12-18
Permission granted2019-03-15
3 months after submission
Operational2019-09-06
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Lancashire’s record on solar

West Lancashire has decided 13 solar farms and approved 77%, taking a median of 1.9 months. See every solar farm decision in West Lancashire

Other built sites within 15 km

SiteMWDistance
Land at Tip Field
Solar Photovoltaics · Under Construction
52.2 km
Jemmys Carr
Solar Photovoltaics · Under Construction
52.5 km
Deyes Academy Redevelopment
Solar Photovoltaics · Under Construction
0.6310.8 km
Crossens Pumping Station - Solar Array
Battery · Under Construction
11.1 km
Lathom (Pilkington Technical Centre)
Solar Photovoltaics · Operational
2.513.9 km
Lathom (Pilkington Technical Centre) Battery Storage
Battery · Operational
213.9 km
Royal Seaforth Dock Wind Farm
Wind Onshore · Operational
314.2 km

How big is Ainsdale Wastewater Treatment Works?

Ainsdale Wastewater Treatment Works has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ainsdale Wastewater Treatment Works?

REPD records the operator as United Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ainsdale Wastewater Treatment Works approved and built?

The application was submitted on 2018-12-18. Permission was granted on 2019-03-15, 3 months later. The site became operational on 2019-09-06, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7279.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council