Land at Five Oaks Farm is an operational 5 MW solar farm in Horsham, generating since 31 March 2016. Planning permission was granted on 19 August 2015, 5 months after submission. Operator of record: Low Carbon.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2016
Solar Photovoltaics
Technology
Low Carbon
Horsham
Authority
England

Planning and build timeline

Application submitted27 March 2015
Permission granted19 August 2015
5 months after submission
Operational31 March 2016
7 months after consent

Screening a site of your own?

RedlineUK · £39

Horsham approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land at Five Oaks Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Horsham’s record on solar

Horsham has decided 18 solar farms and approved 94%, taking a median of 3.8 months. See every solar farm decision in Horsham

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
51.7 km
Solar Photovoltaics · Operational
1.14.9 km
Solar Photovoltaics · Operational
1.76.7 km
Solar Photovoltaics · Operational
0.27.2 km
Landfill Gas · Operational
27.5 km
Landfill Gas · Operational
5.19.8 km
Anaerobic Digestion · Operational
4.59.8 km
Solar Photovoltaics · Operational
511 km

How big is Land at Five Oaks Farm?

Land at Five Oaks Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Five Oaks Farm?

REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Five Oaks Farm approved and built?

The application was submitted on 27 March 2015. Permission was granted on 19 August 2015, 5 months later. The site became operational on 31 March 2016, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5146.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode