Five Oaks Solar Farm is an operational 5 MW solar farm in Horsham, generating since 1 December 2011. Planning permission was granted on 22 July 2011, 5 months after submission. Operator of record: John Laing Environmental Assets.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2011
Solar Photovoltaics
Technology
John Laing Environmental Assets
Horsham
Authority
England

Planning and build timeline

Application submitted15 February 2011
Permission granted22 July 2011
5 months after submission
Operational1 December 2011
4 months after consent

Screening a site of your own?

RedlineUK · £39

Horsham approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Five Oaks Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Horsham’s record on solar

Horsham has decided 18 solar farms and approved 94%, taking a median of 3.8 months. See every solar farm decision in Horsham

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
51.7 km
Solar Photovoltaics · Operational
1.16.2 km
Solar Photovoltaics · Operational
1.77.4 km
Landfill Gas · Operational
27.4 km
Solar Photovoltaics · Operational
0.28.2 km
Solar Photovoltaics · Operational
29.6 km
Landfill Gas · Operational
5.19.7 km
Anaerobic Digestion · Operational
4.59.7 km

How big is Five Oaks Solar Farm?

Five Oaks Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Five Oaks Solar Farm?

REPD records the operator as John Laing Environmental Assets. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Five Oaks Solar Farm approved and built?

The application was submitted on 15 February 2011. Permission was granted on 22 July 2011, 5 months later. The site became operational on 1 December 2011, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1581.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode