Renewable sites › Broockhurst Wood
Broockhurst Wood
Broockhurst Wood is operational in Horsham with a recorded capacity of 2 MW, and has been generating since 2000-12-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2000-12-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Brookhurst Wood Gas to Energy Landfill Gas · Operational | 5.1 | 2.3 km |
Brookhurst Wood (Waste AD) Anaerobic Digestion · Operational | 4.5 | 2.4 km |
St Peters Hall Solar Photovoltaics · Operational | 1.7 | 3.4 km |
Capel Landfill Landfill Gas · Operational | 1 | 5.8 km |
Land at Christ�s Hospital School Solar Photovoltaics · Operational | 1.1 | 5.9 km |
Five Oaks Solar Farm Solar Photovoltaics · Operational | 5 | 7.4 km |
Land at Five Oaks Farm Solar Photovoltaics · Operational | 5 | 7.5 km |
Oriel High School Solar Photovoltaics · Operational | 0.19 | 13.7 km |
How big is Broockhurst Wood?
Broockhurst Wood has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Broockhurst Wood?
REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Broockhurst Wood approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2000-12-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 656.
Novarly Parcel · official public data, read properly · parcel.novarly.com