Renewable sites › Land off Hooklands Lane
Land off Hooklands Lane
Land off Hooklands Lane is operational in Horsham with a recorded capacity of 5 MW, and has been generating since 2016-03-26.
Planning and build timeline
| Application submitted | 2015-08-13 |
| Permission granted | 2015-11-20 3 months after submission |
| Operational | 2016-03-26 4 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Horsham’s record on solar
Horsham has decided 18 solar farms and approved 94%, taking a median of 3.8 months. See every solar farm decision in Horsham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Priors Byne Farm Solar Photovoltaics · Operational | 7.6 | 3.1 km |
Ford Farm (Ashurst) Solar Photovoltaics · Operational | 10 | 4.6 km |
Brinsbury Campus Stane Solar Photovoltaics · Operational | 0.2 | 8 km |
Kings Barn Farm - Energy Barn Battery · Operational | 10 | 8.5 km |
Horton Landfill Site Landfill Gas · Operational | 2 | 9.1 km |
Land at Christ�s Hospital School Solar Photovoltaics · Operational | 1.1 | 9.5 km |
Land at Five Oaks Farm Solar Photovoltaics · Operational | 5 | 11 km |
St Peters Hall Solar Photovoltaics · Operational | 1.7 | 12.3 km |
How big is Land off Hooklands Lane?
Land off Hooklands Lane has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land off Hooklands Lane?
REPD records the operator as Conergy UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land off Hooklands Lane approved and built?
The application was submitted on 2015-08-13. Permission was granted on 2015-11-20, 3 months later. The site became operational on 2016-03-26, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5578.