Brinsbury Campus Stane
Brinsbury Campus Stane is operational in Horsham with a recorded capacity of 0.2 MW, and has been generating since 2021-12-01.
Planning and build timeline
| Application submitted | 2020-03-27 |
| Permission granted | 2020-06-23 3 months after submission |
| Operational | 2021-12-01 17 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Horsham’s record on solar
Horsham has decided 18 solar farms and approved 94%, taking a median of 3.8 months. See every solar farm decision in Horsham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land at Five Oaks Farm Solar Photovoltaics · Operational | 5 | 7.2 km |
Land off Hooklands Lane Solar Photovoltaics · Operational | 5 | 8 km |
Five Oaks Solar Farm Solar Photovoltaics · Operational | 5 | 8.2 km |
Land at Christ�s Hospital School Solar Photovoltaics · Operational | 1.1 | 9.7 km |
Priors Byne Farm Solar Photovoltaics · Operational | 7.6 | 11 km |
Ford Farm (Ashurst) Solar Photovoltaics · Operational | 10 | 12.5 km |
St Peters Hall Solar Photovoltaics · Operational | 1.7 | 12.6 km |
Broockhurst Wood Landfill Gas · Operational | 2 | 14.4 km |
How big is Brinsbury Campus Stane?
Brinsbury Campus Stane has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Brinsbury Campus Stane?
REPD records the operator as Solar Advanced Systems (SAS Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Brinsbury Campus Stane approved and built?
The application was submitted on 2020-03-27. Permission was granted on 2020-06-23, 3 months later. The site became operational on 2021-12-01, 17 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7883.