Renewable sitesBrookhurst Wood (Waste AD)

Brookhurst Wood (Waste AD)

Brookhurst Wood (Waste AD) is operational in Horsham with a recorded capacity of 4.5 MW, and has been generating since 2015-07-01.

4.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-07-01
Anaerobic Digestion
Technology
Biffa/West Sussex County Council
Horsham
Authority
England

Planning and build timeline

Application submitted2009-07-31
Permission granted2010-10-01
14 months after submission
Operational2015-07-01
57 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Brookhurst Wood Gas to Energy
Landfill Gas · Operational
5.10.1 km
Broockhurst Wood
Landfill Gas · Operational
22.4 km
Capel Landfill
Landfill Gas · Operational
14 km
St Peters Hall
Solar Photovoltaics · Operational
1.75 km
Land at Christ�s Hospital School
Solar Photovoltaics · Operational
1.17.9 km
Five Oaks Solar Farm
Solar Photovoltaics · Operational
59.7 km
Land at Five Oaks Farm
Solar Photovoltaics · Operational
59.8 km
Oriel High School
Solar Photovoltaics · Operational
0.1911.8 km

How big is Brookhurst Wood (Waste AD)?

Brookhurst Wood (Waste AD) has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brookhurst Wood (Waste AD)?

REPD records the operator as Biffa/West Sussex County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brookhurst Wood (Waste AD) approved and built?

The application was submitted on 2009-07-31. Permission was granted on 2010-10-01, 14 months later. The site became operational on 2015-07-01, 57 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 312.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council