Novarly ParcelRenewable sites

Renewable sitesLand at Ash Row Farm

Land at Ash Row Farm

Land at Ash Row Farm is operational in North Yorkshire with a recorded capacity of 5 MW, and has been generating since 2015-12-21.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-21
Solar Photovoltaics
Technology
Lightsource Renewable Energy
North Yorkshire
Authority
England

Planning and build timeline

Application submitted2015-07-13
Permission granted2015-09-29
3 months after submission
Operational2015-12-21
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on solar

North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Cranswick Country Foods, Seafox Court - Solar Panels
Solar Photovoltaics · Under Construction
0.650.5 km
Kingspan Insulation Solar Installation
Solar Photovoltaics · Operational
50.6 km
Monk Fryston Battery Storage
Battery · Under Construction
575.7 km
Monk Fryston Battery Storage
Battery · Under Construction
3205.8 km
Hook Moor
Wind Onshore · Operational
10.38 km
Peckfield Quarry Landfill Scheme
Landfill Gas · Operational
3.98.3 km
Kirkhaw Lane - Battery Storage Energy
Battery · Operational
1509.3 km
Kirkhaw Lane
Battery · Operational
209.6 km

How big is Land at Ash Row Farm?

Land at Ash Row Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Ash Row Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Ash Row Farm approved and built?

The application was submitted on 2015-07-13. Permission was granted on 2015-09-29, 3 months later. The site became operational on 2015-12-21, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5402.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council