Novarly ParcelRenewable sites

Renewable sitesCranswick Country Foods, Seafox Court - Solar Panels

Cranswick Country Foods, Seafox Court - Solar Panels

Cranswick Country Foods, Seafox Court - Solar Panels is a 0.65 MW solar farm under construction in North Yorkshire. REPD does not record the planning grant date. Operator of record: Cranswick Gourmet Bacon.

0.65 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Cranswick Gourmet Bacon
North Yorkshire
Authority
England

Planning and build timeline

Application submitted7 October 2022
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

North Yorkshire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Cranswick Country Foods, Seafox Court - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on solar

North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
50.4 km
Solar Photovoltaics · Operational
50.5 km
Battery · Under Construction
575.2 km
Battery · Under Construction
3205.3 km
Wind Onshore · Operational
10.37.8 km
Landfill Gas · Operational
3.98 km
Battery · Operational
1508.8 km
Battery · Operational
209.1 km

How big is Cranswick Country Foods, Seafox Court - Solar Panels?

Cranswick Country Foods, Seafox Court - Solar Panels has a recorded installed capacity of 0.65 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cranswick Country Foods, Seafox Court - Solar Panels?

REPD records the operator as Cranswick Gourmet Bacon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cranswick Country Foods, Seafox Court - Solar Panels approved and built?

The application was submitted on 7 October 2022. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12439.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode