Kingspan Insulation Solar Installation

Kingspan Insulation Solar Installation is an operational 5 MW solar farm in North Yorkshire, generating since 31 March 2014. Planning permission was granted on 12 March 2014, 3 months after submission. Operator of record: Kingspan Insulation/ Eneco.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2014
Solar Photovoltaics
Technology
Kingspan Insulation/ Eneco
North Yorkshire
Authority
England

Planning and build timeline

Application submitted11 December 2013
Permission granted12 March 2014
3 months after submission
Operational31 March 2014
1 months after consent

Screening a site of your own?

RedlineUK · £39

North Yorkshire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kingspan Insulation Solar Installation’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on solar

North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.650.4 km
Solar Photovoltaics · Operational
50.6 km
Battery · Under Construction
575.2 km
Battery · Under Construction
3205.3 km
Wind Onshore · Operational
10.37.5 km
Landfill Gas · Operational
3.97.7 km
Battery · Operational
1508.8 km
Battery · Operational
209.1 km

How big is Kingspan Insulation Solar Installation?

Kingspan Insulation Solar Installation has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kingspan Insulation Solar Installation?

REPD records the operator as Kingspan Insulation/ Eneco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kingspan Insulation Solar Installation approved and built?

The application was submitted on 11 December 2013. Permission was granted on 12 March 2014, 3 months later. The site became operational on 31 March 2014, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1294.