Novarly ParcelRenewable sites

Renewable sitesDean Group Business Park - Hartlepool

Dean Group Business Park - Hartlepool

Dean Group Business Park - Hartlepool is operational in Hartlepool with a recorded capacity of 5.1 MW, and has been generating since 2017-01-09.

5.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-01-09
Anaerobic Digestion
Technology
BioConstruct
Hartlepool
Authority
England

Planning and build timeline

Application submitted2016-01-11
Permission granted2016-04-11
3 months after submission
Operational2017-01-09
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Land at Bluehouse Farm
Solar Photovoltaics · Operational
54.4 km
Stob House Farm
Solar Photovoltaics · Operational
4.96 km
North East Energy Recovery Centre (adjacent to Teesside EfW)
EfW Incineration · Operational
216.6 km
Teesside EfW
EfW Incineration · Operational
19.26.6 km
Teesside EfW (extension)
EfW Incineration · Operational
106.6 km
Port Clarence Biomass Plant
Biomass (dedicated) · Under Construction
406.9 km
Haverton Hill Incinerator
EfW Incineration · Operational
20.16.9 km
ICI No2 (Teesport) Landfill
Landfill Gas · Operational
17 km

How big is Dean Group Business Park - Hartlepool?

Dean Group Business Park - Hartlepool has a recorded installed capacity of 5.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dean Group Business Park - Hartlepool?

REPD records the operator as BioConstruct. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dean Group Business Park - Hartlepool approved and built?

The application was submitted on 2016-01-11. Permission was granted on 2016-04-11, 3 months later. The site became operational on 2017-01-09, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6000.