Planning and build timeline

Application submitted2014-12-19
Permission granted2017-06-13
30 months after submission
Operational1993-01-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westmorland and Furness’s record on onshore wind

Westmorland and Furness has decided 17 onshore wind schemes and approved 35%, taking a median of 16.8 months. See every onshore wind scheme decision in Westmorland and Furness

Other built sites within 15 km

SiteMWDistance
Furness Wind Farm/High Winds (Harlock Repowering)
Wind Onshore · Operational
11.55.4 km
Harlock Hill Wind Farm
Wind Onshore · Operational
2.55.9 km
Askam
Wind Onshore · Operational
4.68.7 km
Roanhead Farm
Solar Photovoltaics · Operational
6.510.4 km
Bennett Bank Landfill Site (lfg)
Landfill Gas · Operational
2.211.7 km
Haverigg Extension Wind Farm
Wind Onshore · Operational
2.413.7 km
Haverigg Repowering (Haverigg II)
Wind Onshore · Operational
1.213.7 km
Sowerby Lodge Farm
Solar Photovoltaics · Operational
514.8 km

How big is Kirkby Moor?

Kirkby Moor has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirkby Moor?

REPD records the operator as Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirkby Moor approved and built?

The application was submitted on 2014-12-19. Permission was granted on 2017-06-13, 30 months later. The site became operational on 1993-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2713.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council