Kirkby Moor

Kirkby Moor is an operational 4.8 MW onshore wind farm in Westmorland and Furness, generating since 1 January 1993. Planning permission was granted on 13 June 2017, 30 months after submission. Operator of record: Npower Renewables.

4.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 1993
Wind Onshore
Technology
Npower Renewables
Westmorland and Furness
Authority
England

Planning and build timeline

Application submitted19 December 2014
Permission granted13 June 2017
30 months after submission
Operational1 January 1993

Screening a site of your own?

RedlineUK · £39

Westmorland and Furness approves 35% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kirkby Moor’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westmorland and Furness’s record on onshore wind

Westmorland and Furness has decided 17 onshore wind schemes and approved 35%, taking a median of 16.8 months. See every onshore wind scheme decision in Westmorland and Furness

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
11.55.4 km
Wind Onshore · Operational
2.55.9 km
Wind Onshore · Operational
4.68.7 km
Solar Photovoltaics · Operational
6.510.4 km
Landfill Gas · Operational
2.211.7 km
Wind Onshore · Operational
2.413.7 km
Wind Onshore · Operational
1.213.7 km
Solar Photovoltaics · Operational
514.8 km

How big is Kirkby Moor?

Kirkby Moor has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirkby Moor?

REPD records the operator as Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirkby Moor approved and built?

The application was submitted on 19 December 2014. Permission was granted on 13 June 2017, 30 months later. The site became operational on 1 January 1993.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2713.