Renewable sitesKilgallioch Windfarm (Extension)

Kilgallioch Windfarm (Extension)

Kilgallioch Windfarm (Extension) is a 50.4 MW onshore wind farm under construction in Scotland. Planning permission was granted on 8 December 2021, 24 months after submission. Operator of record: ScottishPower Renewables.

50.4 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Onshore
Technology
ScottishPower Renewables
National
Authority
Scotland

Planning and build timeline

Application submitted16 December 2019
Permission granted8 December 2021
24 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kilgallioch Windfarm (Extension)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
19.53.5 km
Wind Onshore · Operational
27.53.6 km
Wind Onshore · Operational
2394.2 km
Battery · Under Construction
209.2 km
Wind Onshore · Operational
1209.2 km
Wind Onshore · Under Construction
72.89.2 km
Battery · Under Construction
209.6 km
Wind Onshore · Operational
8.114.6 km

How big is Kilgallioch Windfarm (Extension)?

Kilgallioch Windfarm (Extension) has a recorded installed capacity of 50.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kilgallioch Windfarm (Extension)?

REPD records the operator as ScottishPower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kilgallioch Windfarm (Extension) approved and built?

The application was submitted on 16 December 2019. Permission was granted on 8 December 2021, 24 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7340.