Glenchamber Wind Farm is operational in Dumfries and Galloway with a recorded capacity of 27.5 MW, and has been generating since 2016-06-01.

27.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-01
Wind Onshore
Technology
Renewable Energy Systems (RES)
Dumfries and Galloway
Authority
Scotland

Planning and build timeline

Application submitted2010-10-28
Permission granted2012-07-31
21 months after submission
Operational2016-06-01
46 months after consent

Dumfries and Galloway’s record on onshore wind

Dumfries and Galloway has decided 55 onshore wind schemes and approved 67%, taking a median of 18.5 months. See every onshore wind scheme decision in Dumfries and Galloway

Other built sites within 15 km

SiteMWDistance
Artfield Fell
Wind Onshore · Operational
19.51.5 km
Kilgallioch Windfarm (Extension)
Wind Onshore · Under Construction
50.43.6 km
Kilgallioch wind farm
Wind Onshore · Operational
2394.1 km
Stranoch 2
Battery · Under Construction
209.3 km
Barlockhart Moor
Wind Onshore · Operational
8.111.1 km
Carscreugh Renewable Energy Park
Wind Onshore · Operational
15.311.7 km
Arecleoch Wind Farm (extension)
Battery · Under Construction
2012 km
Arecleoch Wind Farm (extension)
Wind Onshore · Under Construction
72.812 km

How big is Glenchamber Wind Farm?

Glenchamber Wind Farm has a recorded installed capacity of 27.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glenchamber Wind Farm?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glenchamber Wind Farm approved and built?

The application was submitted on 2010-10-28. Permission was granted on 2012-07-31, 21 months later. The site became operational on 2016-06-01, 46 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4638.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council