K L Technologies Wind Turbine
K L Technologies Wind Turbine is operational in King's Lynn and West Norfolk with a recorded capacity of 1.5 MW, and has been generating since 2013-10-30.
Planning and build timeline
| Application submitted | 2011-12-22 |
| Permission granted | 2012-09-05 8 months after submission |
| Operational | 2013-10-30 14 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
King's Lynn and West Norfolk’s record on onshore wind
King's Lynn and West Norfolk has decided 5 onshore wind schemes and approved 80%, taking a median of 21.2 months. See every onshore wind scheme decision in King's Lynn and West Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Porvair International Ltd Solar Photovoltaics · Operational | 1.8 | 0.2 km |
Chamber 16 (Cold Store) Solar Photovoltaics · Operational | 1.2 | 4.2 km |
Blackborough End Landfill Site Landfill Gas · Operational | 1.5 | 9.6 km |
Sutton Bridge Solar Farm Solar Photovoltaics · Operational | 49.9 | 13.1 km |
Walpole Bank Solar Photovoltaics · Under Construction | 40 | 13.7 km |
Rose And Crown Farm Solar Photovoltaics · Operational | 30 | 14.4 km |
The Grange Wind Farm Wind Onshore · Operational | 14 | 15 km |
How big is K L Technologies Wind Turbine?
K L Technologies Wind Turbine has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates K L Technologies Wind Turbine?
REPD records the operator as KL Technology Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was K L Technologies Wind Turbine approved and built?
The application was submitted on 2011-12-22. Permission was granted on 2012-09-05, 8 months later. The site became operational on 2013-10-30, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3842.