Novarly ParcelRenewable sites

Renewable sitesBlackborough End Landfill Site

Blackborough End Landfill Site

Blackborough End Landfill Site is operational in King's Lynn and West Norfolk with a recorded capacity of 1.5 MW, and has been generating since 1996-06-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-06-01
Landfill Gas
Technology
Combined Landfill Projects (CLP)
King's Lynn and West Norfolk
Authority
England

Planning and build timeline

Application submitted1993-12-10
Permission granted1995-12-22
24 months after submission
Operational1996-06-01
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Chamber 16 (Cold Store)
Solar Photovoltaics · Operational
1.25.4 km
Field north of Water Treatment Works / Hoggs Drove
Solar Photovoltaics · Operational
15.8 km
Porvair International Ltd
Solar Photovoltaics · Operational
1.89.4 km
K L Technologies Wind Turbine
Wind Onshore · Operational
1.59.6 km
Burntstalk Solar Park
Solar Photovoltaics · Operational
11.510.9 km
Ryston Estate Solar Park
Solar Photovoltaics · Operational
4.813.2 km

How big is Blackborough End Landfill Site?

Blackborough End Landfill Site has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blackborough End Landfill Site?

REPD records the operator as Combined Landfill Projects (CLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blackborough End Landfill Site approved and built?

The application was submitted on 1993-12-10. Permission was granted on 1995-12-22, 24 months later. The site became operational on 1996-06-01, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 729.