Novarly ParcelRenewable sites

Renewable sitesChamber 16 (Cold Store)

Chamber 16 (Cold Store)

Chamber 16 (Cold Store) is an operational 1.2 MW solar farm in King's Lynn and West Norfolk, generating since 7 June 2016. Planning permission was granted on 11 June 2015, 4 months after submission. Operator of record: Pinguin Foods UK.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 7 June 2016
Solar Photovoltaics
Technology
Pinguin Foods UK
King's Lynn and West Norfolk
Authority
England

Planning and build timeline

Application submitted24 February 2015
Permission granted11 June 2015
4 months after submission
Operational7 June 2016
12 months after consent

Screening a site of your own?

RedlineUK · £39

King's Lynn and West Norfolk approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chamber 16 (Cold Store)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

King's Lynn and West Norfolk’s record on solar

King's Lynn and West Norfolk has decided 31 solar farms and approved 97%, taking a median of 2.9 months. See every solar farm decision in King's Lynn and West Norfolk

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.84 km
Wind Onshore · Operational
1.54.2 km
Landfill Gas · Operational
1.55.4 km
Solar Photovoltaics · Operational
111.2 km

How big is Chamber 16 (Cold Store)?

Chamber 16 (Cold Store) has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chamber 16 (Cold Store)?

REPD records the operator as Pinguin Foods UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chamber 16 (Cold Store) approved and built?

The application was submitted on 24 February 2015. Permission was granted on 11 June 2015, 4 months later. The site became operational on 7 June 2016, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6683.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode