Novarly ParcelRenewable sites

Renewable sitesHopton Road Industrial Estate

Hopton Road Industrial Estate

Hopton Road Industrial Estate is operational in Wiltshire with a recorded capacity of 1.3 MW, and has been generating since 2014-08-01.

1.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-08-01
Solar Photovoltaics
Technology
Hopton PV Ltd
Wiltshire
Authority
England

Planning and build timeline

Application submitted2013-07-03
Permission granted2013-08-30
2 months after submission
Operational2014-08-01
11 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Bromham House Farm
Anaerobic Digestion · Operational
1.55.4 km
Compton Bassett Landfill
Landfill Gas · Operational
27.4 km
Sands Farm Quarry Landfill Site
Landfill Gas · Operational
3.57.6 km
Snarlton Farm (Melksham solar farm)
Solar Photovoltaics · Operational
49.68.5 km
Lower End Farm
Solar Photovoltaics · Operational
4.98.7 km
CRAYSMARSH SOLAR FARM
Solar Photovoltaics · Operational
1.88.9 km
High Penn Solar Park
Solar Photovoltaics · Operational
9.69 km
Stokes Marsh Farm
Solar Photovoltaics · Operational
16.610.8 km

How big is Hopton Road Industrial Estate?

Hopton Road Industrial Estate has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hopton Road Industrial Estate?

REPD records the operator as Hopton PV Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hopton Road Industrial Estate approved and built?

The application was submitted on 2013-07-03. Permission was granted on 2013-08-30, 2 months later. The site became operational on 2014-08-01, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2024.

Novarly Parcel · official public data, read properly · parcel.novarly.com