Sands Farm Quarry Landfill Site

Sands Farm Quarry Landfill Site is an operational 3.5 MW landfill gas site in Wiltshire, generating since 30 September 2003. Planning permission was granted on 7 May 2003, 10 months after submission. Operator of record: Viridor.

3.5 MW
Capacity
as recorded in REPD
Operational
Status
since 30 September 2003
Landfill Gas
Technology
Viridor
Wiltshire
Authority
England

Planning and build timeline

Application submitted12 July 2002
Permission granted7 May 2003
10 months after submission
Operational30 September 2003
5 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Wiltshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Sands Farm Quarry Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
20.4 km
Solar Photovoltaics · Operational
9.61.5 km
Anaerobic Digestion · Operational
1.56.7 km
Solar Photovoltaics · Operational
1.37.6 km
Solar Photovoltaics · Operational
69.87.6 km
Solar Photovoltaics · Operational
510.2 km
Solar Photovoltaics · Operational
49.610.6 km
Solar Photovoltaics · Operational
511.3 km

How big is Sands Farm Quarry Landfill Site?

Sands Farm Quarry Landfill Site has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sands Farm Quarry Landfill Site?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sands Farm Quarry Landfill Site approved and built?

The application was submitted on 12 July 2002. Permission was granted on 7 May 2003, 10 months later. The site became operational on 30 September 2003, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 642.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode