Novarly ParcelRenewable sites

Renewable sitesHome Farm (Knowlton - solar)

Home Farm (Knowlton - solar)

Home Farm (Knowlton - solar) is operational in Dover with a recorded capacity of 11.5 MW, and has been generating since 2014-03-30.

11.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-30
Solar Photovoltaics
Technology
Sunsave 20 (Knowlton) Ltd/ Vogt Solar
Dover
Authority
England

Planning and build timeline

Application submitted2013-05-25
Permission granted2013-10-07
4 months after submission
Operational2014-03-30
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dover’s record on solar

Dover has decided 16 solar farms and approved 88%, taking a median of 3.7 months. See every solar farm decision in Dover

Other built sites within 15 km

SiteMWDistance
Tilmanstone Colliery
Solar Photovoltaics · Operational
102.9 km
Grain Harvesters Ltd
Solar Photovoltaics · Operational
14.3 km
Marshborough Farm solar park
Solar Photovoltaics · Operational
55.6 km
Old Lorry Farm Shop
Solar Photovoltaics · Under Construction
6.5 km
Discovery Park
Biomass (dedicated) · Operational
167.8 km
Littlebourne
Solar Photovoltaics · Operational
179.5 km
Harrington Franklin, Richborough Energy Park - Battery Storage
Battery · Under Construction
49.99.8 km
Ebbsfleet Solar Farm
Solar Photovoltaics · Operational
59.9 km

How big is Home Farm (Knowlton - solar)?

Home Farm (Knowlton - solar) has a recorded installed capacity of 11.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Home Farm (Knowlton - solar)?

REPD records the operator as Sunsave 20 (Knowlton) Ltd/ Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Home Farm (Knowlton - solar) approved and built?

The application was submitted on 2013-05-25. Permission was granted on 2013-10-07, 4 months later. The site became operational on 2014-03-30, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1382.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council