Renewable sites › Harrington Franklin, Richborough Energy Park - Battery Storage
Harrington Franklin, Richborough Energy Park - Battery Storage
Harrington Franklin, Richborough Energy Park - Battery Storage is a 49.9 MW battery storage site under construction in Dover. Planning permission was granted on 6 December 2022, 6 months after submission. Operator of record: EDP Renewables.
Planning and build timeline
| Application submitted | 1 June 2022 |
| Permission granted | 6 December 2022 6 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Dover: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Harrington Franklin, Richborough Energy Park - Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Under Construction | 249 | 0.7 km |
Battery · Operational | 50.1 | 0.8 km |
Battery · Operational | 49.9 | 0.8 km |
Solar Photovoltaics · Operational | 5 | 0.8 km |
Solar Photovoltaics · Operational | 4.9 | 1.1 km |
Biomass (dedicated) · Operational | 16 | 2.5 km |
Solar Photovoltaics · Under Construction | 33 | 3.5 km |
Solar Photovoltaics · Operational | 6.2 | 3.6 km |
How big is Harrington Franklin, Richborough Energy Park - Battery Storage?
Harrington Franklin, Richborough Energy Park - Battery Storage has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Harrington Franklin, Richborough Energy Park - Battery Storage?
REPD records the operator as EDP Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Harrington Franklin, Richborough Energy Park - Battery Storage approved and built?
The application was submitted on 1 June 2022. Permission was granted on 6 December 2022, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11449.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode