Renewable sites › Old Lorry Farm Shop
Old Lorry Farm Shop
Old Lorry Farm Shop is under construction in Dover.
Planning and build timeline
| Application submitted | 2020-11-18 |
| Permission granted | 2021-01-20 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Dover’s record on solar
Dover has decided 16 solar farms and approved 88%, taking a median of 3.7 months. See every solar farm decision in Dover →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Discovery Park Biomass (dedicated) · Operational | 16 | 5.6 km |
Marshborough Farm solar park Solar Photovoltaics · Operational | 5 | 6 km |
Tilmanstone Colliery Solar Photovoltaics · Operational | 10 | 6.3 km |
Home Farm (Knowlton - solar) Solar Photovoltaics · Operational | 11.5 | 6.5 km |
Harrington Franklin, Richborough Energy Park - Battery Storage Battery · Under Construction | 49.9 | 8 km |
Ebbsfleet Solar Farm Solar Photovoltaics · Operational | 5 | 8.6 km |
Richborough Energy Park - Phase 3 (Sheaf) Battery · Under Construction | 249 | 8.7 km |
Richborough Energy Park - Phase 2 Battery · Operational | 50.1 | 8.7 km |
How big is Old Lorry Farm Shop?
REPD does not record an installed capacity for Old Lorry Farm Shop.
Who operates Old Lorry Farm Shop?
REPD records the operator as Old Lorry Farm Shop. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Old Lorry Farm Shop approved and built?
The application was submitted on 2020-11-18. Permission was granted on 2021-01-20, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8192.
Novarly Parcel · official public data, read properly · parcel.novarly.com