Discovery Park

Discovery Park is an operational 16 MW biomass plant in Dover, generating since 28 September 2018. Planning permission was granted on 18 October 2013, 2 months after submission. Operator of record: Burmeister & Wain Scandinavian Contractor (BWSC).

16 MW
Capacity
as recorded in REPD
Operational
Status
since 28 September 2018
Biomass (dedicated)
Technology
Burmeister & Wain Scandinavian Contractor (BWSC)
Dover
Authority
England

Planning and build timeline

Application submitted23 August 2013
Permission granted18 October 2013
2 months after submission
Operational28 September 2018
59 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Dover: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Discovery Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
49.92.5 km
Solar Photovoltaics · Operational
52.8 km
Solar Photovoltaics · Operational
53 km
Battery · Operational
50.13.1 km
Battery · Operational
49.93.1 km
Battery · Under Construction
2493.1 km
Solar Photovoltaics · Operational
4.93.5 km
Solar Photovoltaics · Under Construction
5.6 km

How big is Discovery Park?

Discovery Park has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Discovery Park?

REPD records the operator as Burmeister & Wain Scandinavian Contractor (BWSC). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Discovery Park approved and built?

The application was submitted on 23 August 2013. Permission was granted on 18 October 2013, 2 months later. The site became operational on 28 September 2018, 59 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 173.