Renewable sitesHelland Meads

Helland Meads

Helland Meads is operational in Somerset with a recorded capacity of 1.2 MW, and has been generating since 2014-11-01.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-11-01
Solar Photovoltaics
Technology
Private Developer
Somerset
Authority
England

Planning and build timeline

Application submitted2014-04-09
Permission granted2014-06-30
3 months after submission
Operational2014-11-01
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
Higher Knapp Farm
Solar Photovoltaics · Operational
1.52.6 km
Aller Court Farm Solar Park
Solar Photovoltaics · Operational
58 km
Taunton Racecourse
Solar Photovoltaics · Operational
1.59.4 km
Parsonage Barn (extension)
Solar Photovoltaics · Operational
7.69.9 km
Showground Road
EfW Incineration · Under Construction
7.810.6 km
Hurcott Copse Solar Farm
Solar Photovoltaics · Operational
1011 km
Park Wall Solar Park
Solar Photovoltaics · Operational
511.4 km
Summerway Drove
Solar Photovoltaics · Operational
211.7 km

How big is Helland Meads?

Helland Meads has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Helland Meads?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Helland Meads approved and built?

The application was submitted on 2014-04-09. Permission was granted on 2014-06-30, 3 months later. The site became operational on 2014-11-01, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2164.