Renewable sitesPark Wall Solar Park

Park Wall Solar Park

Park Wall Solar Park is operational in Somerset with a recorded capacity of 5 MW, and has been generating since 2013-03-21.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-21
Solar Photovoltaics
Technology
Unknown
Somerset
Authority
England

Planning and build timeline

Application submitted2011-03-01
Permission granted2011-05-24
3 months after submission
Operational2013-03-21
22 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
Summerway Drove
Solar Photovoltaics · Operational
20.5 km
Showground Road
EfW Incineration · Under Construction
7.81.5 km
Cobbs Cross Solar Park
Solar Photovoltaics · Operational
54.7 km
Horsey Levels - Solar Farm
Solar Photovoltaics · Operational
244.7 km
Puriton Solar Farm
Solar Photovoltaics · Operational
4.66.3 km
Puriton Landfill Solar Farm
Solar Photovoltaics · Operational
11.46.6 km
Walpole Landfill
Landfill Gas · Operational
1.67.2 km
Walpole Landfill AD (Waste AD)
Anaerobic Digestion · Operational
1.67.2 km

How big is Park Wall Solar Park?

Park Wall Solar Park has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Park Wall Solar Park?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Park Wall Solar Park approved and built?

The application was submitted on 2011-03-01. Permission was granted on 2011-05-24, 3 months later. The site became operational on 2013-03-21, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1103.