Novarly ParcelRenewable sites

Renewable sitesShowground Road

Showground Road

Showground Road is under construction in Somerset with a recorded capacity of 7.8 MW.

7.8 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Bridgwater Resource Recovery
Somerset
Authority
England

Planning and build timeline

Application submitted2014-07-17
Permission granted2015-04-24
9 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Park Wall Solar Park
Solar Photovoltaics · Operational
51.5 km
Summerway Drove
Solar Photovoltaics · Operational
22 km
Cobbs Cross Solar Park
Solar Photovoltaics · Operational
53.5 km
Horsey Levels - Solar Farm
Solar Photovoltaics · Operational
245.7 km
Puriton Solar Farm
Solar Photovoltaics · Operational
4.67.4 km
Puriton Landfill Solar Farm
Solar Photovoltaics · Operational
11.47.6 km
Walpole Landfill
Landfill Gas · Operational
1.68.1 km
Walpole Landfill AD (Waste AD)
Anaerobic Digestion · Operational
1.68.1 km

How big is Showground Road?

Showground Road has a recorded installed capacity of 7.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Showground Road?

REPD records the operator as Bridgwater Resource Recovery. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Showground Road approved and built?

The application was submitted on 2014-07-17. Permission was granted on 2015-04-24, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6257.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council