Novarly ParcelRenewable sites

Renewable sitesAller Court Farm Solar Park

Aller Court Farm Solar Park

Aller Court Farm Solar Park is operational in Somerset with a recorded capacity of 5 MW, and has been generating since 2017-04-01.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-04-01
Solar Photovoltaics
Technology
NESF (formerly British Solar Renewables)
Somerset
Authority
England

Planning and build timeline

Application submitted2014-09-22
Permission granted2016-06-08
21 months after submission
Operational2017-04-01
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
Tengore Lane
Solar Photovoltaics · Operational
3.65.4 km
Redlands Farm
Solar Photovoltaics · Operational
6.26.9 km
Somerton Door Farm
Solar Photovoltaics · Operational
8.77.6 km
Helland Meads
Solar Photovoltaics · Operational
1.28 km
Whitley Farm (1 of 2)
Solar Photovoltaics · Operational
3.59.5 km
Whitley Farm (2 of 2)
Solar Photovoltaics · Operational
3.59.7 km
Summerway Drove
Solar Photovoltaics · Operational
210.1 km
Park Wall Solar Park
Solar Photovoltaics · Operational
510.1 km

How big is Aller Court Farm Solar Park?

Aller Court Farm Solar Park has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Aller Court Farm Solar Park?

REPD records the operator as NESF (formerly British Solar Renewables). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aller Court Farm Solar Park approved and built?

The application was submitted on 2014-09-22. Permission was granted on 2016-06-08, 21 months later. The site became operational on 2017-04-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1646.

Novarly Parcel · official public data, read properly · parcel.novarly.com