Renewable sites › Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array
Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array
Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array is an operational 0.24 MW solar farm in South Lanarkshire, generating since 1 January 2025. Planning permission was granted on 8 April 2024, 2 months after submission. Operator of record: Scottish Water National Operations Control Centre.
Planning and build timeline
| Application submitted | 2 February 2024 |
| Permission granted | 8 April 2024 2 months after submission |
| Operational | 1 January 2025 9 months after consent |
Screening a site of your own?
South Lanarkshire approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array’s recorded coordinate — swap in your own postcode or coordinates.
South Lanarkshire’s record on solar
South Lanarkshire has decided 19 solar farms and approved 95%, taking a median of 2.2 months. See every solar farm decision in South Lanarkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 7.4 | 4 km |
Wind Onshore · Operational | 7.5 | 5.1 km |
Wind Onshore · Operational | 9 | 5.1 km |
Small Hydro · Operational | — | 5.3 km |
Solar Photovoltaics · Under Construction | 0.94 | 5.4 km |
Wind Onshore · Operational | 3 | 5.4 km |
Landfill Gas · Operational | 3.9 | 6.6 km |
Anaerobic Digestion · Operational | 5 | 9.2 km |
How big is Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array?
Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array?
REPD records the operator as Scottish Water National Operations Control Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array approved and built?
The application was submitted on 2 February 2024. Permission was granted on 8 April 2024, 2 months later. The site became operational on 1 January 2025, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15973.