Novarly ParcelRenewable sites

Renewable sitesAllers Wastewater Treatment Works, Barrie Road - Solar Pv Array

Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array

Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array is an operational 0.24 MW solar farm in South Lanarkshire, generating since 1 January 2025. Planning permission was granted on 8 April 2024, 2 months after submission. Operator of record: Scottish Water National Operations Control Centre.

0.24 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2025
Solar Photovoltaics
Technology
Scottish Water National Operations Control Centre
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted2 February 2024
Permission granted8 April 2024
2 months after submission
Operational1 January 2025
9 months after consent

Screening a site of your own?

RedlineUK · £39

South Lanarkshire approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

South Lanarkshire’s record on solar

South Lanarkshire has decided 19 solar farms and approved 95%, taking a median of 2.2 months. See every solar farm decision in South Lanarkshire

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
7.44 km
Wind Onshore · Operational
7.55.1 km
Wind Onshore · Operational
95.1 km
Small Hydro · Operational
5.3 km
Solar Photovoltaics · Under Construction
0.945.4 km
Wind Onshore · Operational
35.4 km
Landfill Gas · Operational
3.96.6 km
Anaerobic Digestion · Operational
59.2 km

How big is Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array?

Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array?

REPD records the operator as Scottish Water National Operations Control Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array approved and built?

The application was submitted on 2 February 2024. Permission was granted on 8 April 2024, 2 months later. The site became operational on 1 January 2025, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15973.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode