Novarly ParcelRenewable sites

Renewable sitesAllers Wastewater Treatment Works, Barrie Road - Solar Pv Array

Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array

Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array is operational in South Lanarkshire with a recorded capacity of 0.24 MW, and has been generating since 2025-01-01.

0.24 MW
Capacity
as recorded in REPD
Operational
Status
since 2025-01-01
Solar Photovoltaics
Technology
Scottish Water National Operations Control Centre
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted2024-02-02
Permission granted2024-04-08
2 months after submission
Operational2025-01-01
9 months after consent

South Lanarkshire’s record on solar

South Lanarkshire has decided 19 solar farms and approved 95%, taking a median of 2.2 months. See every solar farm decision in South Lanarkshire

Other built sites within 15 km

SiteMWDistance
South Cathkin Landfill Site
Landfill Gas · Operational
7.44 km
Blantyre Muir Wind Farm
Wind Onshore · Operational
95.1 km
Blantyre Muir Wind Farm extension
Wind Onshore · Operational
7.55.1 km
Hamilton Waste Water Treatment Works - Hydro Scheme
Small Hydro · Operational
5.3 km
Tennant Avenue College, East Kilbride - Solar Panels
Solar Photovoltaics · Under Construction
0.945.4 km
Cathkin Braes Wind Farm (Castlemilk)
Wind Onshore · Operational
35.4 km
Greenoakhill
Landfill Gas · Operational
3.96.6 km
Glasgow Renewable Energy and Recycling Centre (Waste AD)
Anaerobic Digestion · Operational
59.2 km

How big is Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array?

Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array?

REPD records the operator as Scottish Water National Operations Control Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array approved and built?

The application was submitted on 2024-02-02. Permission was granted on 2024-04-08, 2 months later. The site became operational on 2025-01-01, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15973.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council