S P & G Blything, Cross Lanes - Biomass Boiler

S P & G Blything, Cross Lanes - Biomass Boiler is operational in Cheshire West and Chester with a recorded capacity of 0.3 MW, and has been generating since 2023-01-01.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-01-01
Biomass (dedicated)
Technology
S P & G Blything
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submitted2022-08-02
Permission granted2022-11-22
4 months after submission
Operational2023-01-01
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Gowy Landfill Site
Landfill Gas · Operational
1.67.4 km
Gowy Landfill Site, Cheshire (Extension)
Landfill Gas · Operational
67.4 km
Huntington Water Treatment Works
Solar Photovoltaics · Operational
7.27.4 km
Ince Bio Power
Advanced Conversion Technologies · Operational
21.511.3 km
Plot 8 Protos/Ince Marshes
EfW Incineration · Under Construction
3511.5 km
Longlooms Road East - Solar panels
Solar Photovoltaics · Operational
0.2211.7 km
Frodsham Marsh
Wind Onshore · Operational
50.412.6 km

How big is S P & G Blything, Cross Lanes - Biomass Boiler?

S P & G Blything, Cross Lanes - Biomass Boiler has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates S P & G Blything, Cross Lanes - Biomass Boiler?

REPD records the operator as S P & G Blything. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was S P & G Blything, Cross Lanes - Biomass Boiler approved and built?

The application was submitted on 2022-08-02. Permission was granted on 2022-11-22, 4 months later. The site became operational on 2023-01-01, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12139.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council