Goosey Lodge Industrial Estate is operational in Central Bedfordshire with a recorded capacity of 16 MW, and has been generating since 2000-12-31.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2000-12-31 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Central Bedfordshire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Brogborough Phase III Landfill Gas · Operational | 11 | 3.6 km |
Brogborough Phase IV Landfill Gas · Operational | 11 | 3.9 km |
Harvie Card Way - Solar panels Solar Photovoltaics · Operational | 1.97 | 4.5 km |
Cranfield Airfield Solar Photovoltaics · Operational | 1 | 5.2 km |
University Way, Cranfield - Solar Array Solar Photovoltaics · Operational | 0.88 | 5.8 km |
Cranfield University - Solar Farm Solar Photovoltaics · Operational | 0.44 | 5.9 km |
Blum Uk - Solar Panels Solar Photovoltaics · Operational | — | 6.5 km |
Marston Vale Country Park Wind Turbine Wind Onshore · Operational | 1.5 | 6.6 km |
How big is Goosey Lodge Industrial Estate?
Goosey Lodge Industrial Estate has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Goosey Lodge Industrial Estate?
REPD records the operator as Ancillary Components. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Goosey Lodge Industrial Estate approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2000-12-31.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 49.