Novarly ParcelRenewable sites

Renewable sitesGoosey Lodge Industrial Estate

Goosey Lodge Industrial Estate

Goosey Lodge Industrial Estate is operational in Central Bedfordshire with a recorded capacity of 16 MW, and has been generating since 2000-12-31.

16 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-12-31
Biomass (dedicated)
Technology
Ancillary Components
Central Bedfordshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2000-12-31

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Brogborough Phase III
Landfill Gas · Operational
113.6 km
Brogborough Phase IV
Landfill Gas · Operational
113.9 km
Harvie Card Way - Solar panels
Solar Photovoltaics · Operational
1.974.5 km
Cranfield Airfield
Solar Photovoltaics · Operational
15.2 km
University Way, Cranfield - Solar Array
Solar Photovoltaics · Operational
0.885.8 km
Cranfield University - Solar Farm
Solar Photovoltaics · Operational
0.445.9 km
Blum Uk - Solar Panels
Solar Photovoltaics · Operational
6.5 km
Marston Vale Country Park Wind Turbine
Wind Onshore · Operational
1.56.6 km

How big is Goosey Lodge Industrial Estate?

Goosey Lodge Industrial Estate has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Goosey Lodge Industrial Estate?

REPD records the operator as Ancillary Components. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Goosey Lodge Industrial Estate approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2000-12-31.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 49.

Novarly Parcel · official public data, read properly · parcel.novarly.com