Renewable sites › Blum Uk - Solar Panels
Blum Uk - Solar Panels
Blum Uk - Solar Panels is operational in Milton Keynes, and has been generating since 2023-07-28.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2023-07-28 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Milton Keynes’s record on solar
Milton Keynes has decided 46 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Milton Keynes →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Harvie Card Way - Solar panels Solar Photovoltaics · Operational | 1.97 | 2.3 km |
Caldecote Farm - Storage & Distribution Unit Solar Photovoltaics · Under Construction | 0.26 | 4 km |
University Way, Cranfield - Solar Array Solar Photovoltaics · Operational | 0.88 | 4.8 km |
Falcon Project Battery · Operational | 0.3 | 4.8 km |
Cranfield University - Solar Farm Solar Photovoltaics · Operational | 0.44 | 5.1 km |
Cranfield Airfield Solar Photovoltaics · Operational | 1 | 6 km |
Goosey Lodge Industrial Estate Biomass (dedicated) · Operational | 16 | 6.5 km |
Brogborough Phase III Landfill Gas · Operational | 11 | 7.1 km |
How big is Blum Uk - Solar Panels?
REPD does not record an installed capacity for Blum Uk - Solar Panels.
Who operates Blum Uk - Solar Panels?
REPD records the operator as Blum Uk Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Blum Uk - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2023-07-28.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14509.