Blum Uk - Solar Panels is operational in Milton Keynes, and has been generating since 2023-07-28.

Capacity
as recorded in REPD
Operational
Status
since 2023-07-28
Solar Photovoltaics
Technology
Blum Uk Ltd
Milton Keynes
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2023-07-28

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Milton Keynes’s record on solar

Milton Keynes has decided 46 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Milton Keynes

Other built sites within 15 km

SiteMWDistance
Harvie Card Way - Solar panels
Solar Photovoltaics · Operational
1.972.3 km
Caldecote Farm - Storage & Distribution Unit
Solar Photovoltaics · Under Construction
0.264 km
University Way, Cranfield - Solar Array
Solar Photovoltaics · Operational
0.884.8 km
Falcon Project
Battery · Operational
0.34.8 km
Cranfield University - Solar Farm
Solar Photovoltaics · Operational
0.445.1 km
Cranfield Airfield
Solar Photovoltaics · Operational
16 km
Goosey Lodge Industrial Estate
Biomass (dedicated) · Operational
166.5 km
Brogborough Phase III
Landfill Gas · Operational
117.1 km

How big is Blum Uk - Solar Panels?

REPD does not record an installed capacity for Blum Uk - Solar Panels.

Who operates Blum Uk - Solar Panels?

REPD records the operator as Blum Uk Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blum Uk - Solar Panels approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2023-07-28.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14509.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council