Brogborough Phase III is operational in Central Bedfordshire with a recorded capacity of 11 MW, and has been generating since 2001-04-29.

11 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-04-29
Landfill Gas
Technology
Waste Recycling Group
Central Bedfordshire
Authority
England

Planning and build timeline

Application submitted1990-04-19
Permission granted1990-08-07
4 months after submission
Operational2001-04-29
129 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Brogborough Phase IV
Landfill Gas · Operational
110.4 km
Cranfield Airfield
Solar Photovoltaics · Operational
12.4 km
Goosey Lodge Industrial Estate
Biomass (dedicated) · Operational
163.6 km
Cranfield University - Solar Farm
Solar Photovoltaics · Operational
0.443.6 km
University Way, Cranfield - Solar Array
Solar Photovoltaics · Operational
0.883.8 km
Marston Vale Country Park Wind Turbine
Wind Onshore · Operational
1.53.8 km
Harvie Card Way - Solar panels
Solar Photovoltaics · Operational
1.974.9 km
Rookery South
EfW Incineration · Operational
654.9 km

How big is Brogborough Phase III?

Brogborough Phase III has a recorded installed capacity of 11 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brogborough Phase III?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brogborough Phase III approved and built?

The application was submitted on 1990-04-19. Permission was granted on 1990-08-07, 4 months later. The site became operational on 2001-04-29, 129 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 515.