Brogborough Phase III

Brogborough Phase III is an operational 11 MW landfill gas site in Central Bedfordshire, generating since 29 April 2001. Planning permission was granted on 7 August 1990, 4 months after submission. Operator of record: Waste Recycling Group.

11 MW
Capacity
as recorded in REPD
Operational
Status
since 29 April 2001
Landfill Gas
Technology
Waste Recycling Group
Central Bedfordshire
Authority
England

Planning and build timeline

Application submitted19 April 1990
Permission granted7 August 1990
4 months after submission
Operational29 April 2001
129 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Central Bedfordshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Brogborough Phase III’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
110.4 km
Solar Photovoltaics · Operational
12.4 km
Biomass (dedicated) · Operational
163.6 km
Solar Photovoltaics · Operational
0.443.6 km
Solar Photovoltaics · Operational
0.883.8 km
Wind Onshore · Operational
1.53.8 km
Solar Photovoltaics · Operational
1.974.9 km
EfW Incineration · Operational
654.9 km

How big is Brogborough Phase III?

Brogborough Phase III has a recorded installed capacity of 11 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brogborough Phase III?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brogborough Phase III approved and built?

The application was submitted on 19 April 1990. Permission was granted on 7 August 1990, 4 months later. The site became operational on 29 April 2001, 129 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 515.