Renewable sites › Cranfield University - Solar Farm
Cranfield University - Solar Farm
Cranfield University - Solar Farm is operational in Central Bedfordshire with a recorded capacity of 0.44 MW, and has been generating since 2021-10-01.
Planning and build timeline
| Application submitted | 2021-01-21 |
| Permission granted | 2021-08-23 7 months after submission |
| Operational | 2021-10-01 1 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Central Bedfordshire’s record on solar
Central Bedfordshire has decided 32 solar farms and approved 97%, taking a median of 3.2 months. See every solar farm decision in Central Bedfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
University Way, Cranfield - Solar Array Solar Photovoltaics · Operational | 0.88 | 0.3 km |
Cranfield Airfield Solar Photovoltaics · Operational | 1 | 1.3 km |
Brogborough Phase IV Landfill Gas · Operational | 11 | 3.4 km |
Brogborough Phase III Landfill Gas · Operational | 11 | 3.6 km |
Harvie Card Way - Solar panels Solar Photovoltaics · Operational | 1.97 | 3.6 km |
Blum Uk - Solar Panels Solar Photovoltaics · Operational | — | 5.1 km |
Goosey Lodge Industrial Estate Biomass (dedicated) · Operational | 16 | 5.9 km |
Caldecote Farm - Storage & Distribution Unit Solar Photovoltaics · Under Construction | 0.26 | 5.9 km |
How big is Cranfield University - Solar Farm?
Cranfield University - Solar Farm has a recorded installed capacity of 0.44 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cranfield University - Solar Farm?
REPD records the operator as Cranfield University. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cranfield University - Solar Farm approved and built?
The application was submitted on 2021-01-21. Permission was granted on 2021-08-23, 7 months later. The site became operational on 2021-10-01, 1 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8811.
Novarly Parcel · official public data, read properly · parcel.novarly.com