Brogborough Phase IV
Brogborough Phase IV is operational in Central Bedfordshire with a recorded capacity of 11 MW, and has been generating since 2000-02-04.
Planning and build timeline
| Application submitted | 1999-01-15 |
| Permission granted | 1999-04-01 2 months after submission |
| Operational | 2000-02-04 10 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Brogborough Phase III Landfill Gas · Operational | 11 | 0.4 km |
Cranfield Airfield Solar Photovoltaics · Operational | 1 | 2.2 km |
Cranfield University - Solar Farm Solar Photovoltaics · Operational | 0.44 | 3.4 km |
University Way, Cranfield - Solar Array Solar Photovoltaics · Operational | 0.88 | 3.6 km |
Marston Vale Country Park Wind Turbine Wind Onshore · Operational | 1.5 | 3.7 km |
Goosey Lodge Industrial Estate Biomass (dedicated) · Operational | 16 | 3.9 km |
Rookery South EfW Incineration · Operational | 65 | 4.7 km |
Harvie Card Way - Solar panels Solar Photovoltaics · Operational | 1.97 | 5 km |
How big is Brogborough Phase IV?
Brogborough Phase IV has a recorded installed capacity of 11 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Brogborough Phase IV?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Brogborough Phase IV approved and built?
The application was submitted on 1999-01-15. Permission was granted on 1999-04-01, 2 months later. The site became operational on 2000-02-04, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 516.