Renewable sites › Turret water treatment works
Turret water treatment works
Turret water treatment works is operational in Perth and Kinross with a recorded capacity of 1.9 MW, and has been generating since 1952-01-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1952-01-01 |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lednock Small Hydro · Operational | 3 | 9.8 km |
Strathallan Wind Farm Wind Onshore · Under Construction | 20.7 | 10 km |
Gleneagles Hotel Biomass Boiler Plant Room Biomass (dedicated) · Operational | 1.2 | 11.3 km |
Dalchonzie Small Hydro · Operational | 4 | 12.5 km |
How big is Turret water treatment works?
Turret water treatment works has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Turret water treatment works?
REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Turret water treatment works approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1952-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 419.
Novarly Parcel · official public data, read properly · parcel.novarly.com