Glenbuck is an operational 6.9 MW onshore wind farm in Causeway Coast and Glens, generating since 1 March 2017. Planning permission was granted on 27 June 2011, 56 months after submission. Operator of record: Energia Renewables.

6.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2017
Wind Onshore
Technology
Energia Renewables
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted1 November 2006
Permission granted27 June 2011
56 months after submission
Operational1 March 2017
68 months after consent

Screening a site of your own?

RedlineUK · £39

Causeway Coast and Glens approves 97% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Glenbuck’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Causeway Coast and Glens’s record on onshore wind

Causeway Coast and Glens has decided 37 onshore wind schemes and approved 97%, taking a median of 27.4 months. See every onshore wind scheme decision in Causeway Coast and Glens

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.30 km
Solar Photovoltaics · Operational
252.2 km
Wind Onshore · Operational
27.63.5 km
Solar Photovoltaics · Operational
5.97.3 km
Wind Onshore · Operational
258.2 km
Solar Photovoltaics · Operational
188.7 km
Wind Onshore · Operational
58.8 km
Wind Onshore · Operational
2.59.3 km

How big is Glenbuck?

Glenbuck has a recorded installed capacity of 6.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glenbuck?

REPD records the operator as Energia Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glenbuck approved and built?

The application was submitted on 1 November 2006. Permission was granted on 27 June 2011, 56 months later. The site became operational on 1 March 2017, 68 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3962.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode