Novarly ParcelRenewable sites

Renewable sitesGruig Wind Farm

Gruig Wind Farm

Gruig Wind Farm is an operational 25 MW onshore wind farm in Causeway Coast and Glens, generating since 27 January 2009. Planning permission was granted on 25 June 2007, 32 months after submission. Operator of record: Foresight Group.

25 MW
Capacity
as recorded in REPD
Operational
Status
since 27 January 2009
Wind Onshore
Technology
Foresight Group
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted18 October 2004
Permission granted25 June 2007
32 months after submission
Operational27 January 2009
19 months after consent

Screening a site of your own?

RedlineUK · £39

Causeway Coast and Glens approves 97% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Gruig Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Causeway Coast and Glens’s record on onshore wind

Causeway Coast and Glens has decided 37 onshore wind schemes and approved 97%, taking a median of 27.4 months. See every onshore wind scheme decision in Causeway Coast and Glens

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
52.8 km
Wind Onshore · Operational
2.52.9 km
Wind Onshore · Operational
17.97.5 km
Wind Onshore · Operational
6.98.2 km
Wind Onshore · Operational
2.38.2 km
Solar Photovoltaics · Operational
2510.2 km
Wind Onshore · Operational
2110.3 km
Wind Onshore · Operational
27.610.7 km

How big is Gruig Wind Farm?

Gruig Wind Farm has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gruig Wind Farm?

REPD records the operator as Foresight Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gruig Wind Farm approved and built?

The application was submitted on 18 October 2004. Permission was granted on 25 June 2007, 32 months later. The site became operational on 27 January 2009, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3241.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode