Novarly ParcelRenewable sites

Renewable sitesGruig Wind Farm

Gruig Wind Farm

Gruig Wind Farm is operational in Causeway Coast and Glens with a recorded capacity of 25 MW, and has been generating since 2009-01-27.

25 MW
Capacity
as recorded in REPD
Operational
Status
since 2009-01-27
Wind Onshore
Technology
Foresight Group
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted2004-10-18
Permission granted2007-06-25
32 months after submission
Operational2009-01-27
19 months after consent

Causeway Coast and Glens’s record on onshore wind

Causeway Coast and Glens has decided 37 onshore wind schemes and approved 97%, taking a median of 27.4 months. See every onshore wind scheme decision in Causeway Coast and Glens

Other built sites within 15 km

SiteMWDistance
Corkey Wind Farm
Wind Onshore · Operational
52.8 km
Corkey Wind Farm Extension
Wind Onshore · Operational
2.52.9 km
Altaveedan Wind Farm
Wind Onshore · Operational
17.97.5 km
Glenbuck
Wind Onshore · Operational
2.38.2 km
Glenbuck
Wind Onshore · Operational
6.98.2 km
Bann Road (Tullaghans Road)
Solar Photovoltaics · Operational
2510.2 km
Rathsherry
Wind Onshore · Operational
2110.3 km
Long Mountain
Wind Onshore · Operational
27.610.7 km

How big is Gruig Wind Farm?

Gruig Wind Farm has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gruig Wind Farm?

REPD records the operator as Foresight Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gruig Wind Farm approved and built?

The application was submitted on 2004-10-18. Permission was granted on 2007-06-25, 32 months later. The site became operational on 2009-01-27, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3241.