Novarly ParcelRenewable sites

Renewable sitesBann Road (Tullaghans Road)

Bann Road (Tullaghans Road)

Bann Road (Tullaghans Road) is an operational 25 MW solar farm in Causeway Coast and Glens, generating since 15 February 2017. Planning permission was granted on 4 August 2016, 8 months after submission. Operator of record: Greencoat Capital.

25 MW
Capacity
as recorded in REPD
Operational
Status
since 15 February 2017
Solar Photovoltaics
Technology
Greencoat Capital
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted14 December 2015
Permission granted4 August 2016
8 months after submission
Operational15 February 2017
6 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Causeway Coast and Glens: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bann Road (Tullaghans Road)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
27.61.6 km
Wind Onshore · Operational
2.32.2 km
Wind Onshore · Operational
6.92.2 km
Solar Photovoltaics · Operational
5.95.1 km
Solar Photovoltaics · Operational
186.5 km
Wind Onshore · Operational
158 km
Wind Onshore · Operational
2510.2 km
Wind Onshore · Operational
511 km

How big is Bann Road (Tullaghans Road)?

Bann Road (Tullaghans Road) has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bann Road (Tullaghans Road)?

REPD records the operator as Greencoat Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bann Road (Tullaghans Road) approved and built?

The application was submitted on 14 December 2015. Permission was granted on 4 August 2016, 8 months later. The site became operational on 15 February 2017, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5955.