Novarly ParcelRenewable sites

Renewable sitesBann Road (Rasharkin)

Bann Road (Rasharkin)

Bann Road (Rasharkin) is an operational 18 MW solar farm in Causeway Coast and Glens, generating since 6 April 2017. REPD does not record the planning grant date. Operator of record: Elgin Energy.

18 MW
Capacity
as recorded in REPD
Operational
Status
since 6 April 2017
Solar Photovoltaics
Technology
Elgin Energy
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted19 September 2014
Permission grantednot recorded
Operational6 April 2017

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Causeway Coast and Glens: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bann Road (Rasharkin)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
5.91.5 km
Wind Onshore · Operational
27.65.4 km
Wind Onshore · Operational
155.7 km
Solar Photovoltaics · Operational
256.5 km
Wind Onshore · Operational
2.38.7 km
Wind Onshore · Operational
6.98.7 km

How big is Bann Road (Rasharkin)?

Bann Road (Rasharkin) has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bann Road (Rasharkin)?

REPD records the operator as Elgin Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bann Road (Rasharkin) approved and built?

The application was submitted on 19 September 2014. REPD does not record a grant date. The site became operational on 6 April 2017.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6506.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode