Turves Solar Farm is an operational 5 MW solar farm in Fenland, generating since 19 March 2013. Planning permission was granted on 12 April 2012, 11 months after submission. Operator of record: Abbey Renewables.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 19 March 2013
Solar Photovoltaics
Technology
Abbey Renewables
Fenland
Authority
England

Planning and build timeline

Application submitted13 May 2011
Permission granted12 April 2012
11 months after submission
Operational19 March 2013
11 months after consent

Screening a site of your own?

RedlineUK · £39

Fenland approves 91% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Turves Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fenland’s record on solar

Fenland has decided 22 solar farms and approved 91%, taking a median of 2.8 months. See every solar farm decision in Fenland

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.70.1 km
Wind Onshore · Operational
60.9 km
Wind Onshore · Operational
1.51.8 km
Wind Onshore · Operational
64.4 km
Wind Onshore · Operational
44.8 km
Wind Onshore · Operational
165.8 km
Wind Onshore · Operational
125.8 km
Wind Onshore · Operational
10.35.9 km

How big is Turves Solar Farm?

Turves Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Turves Solar Farm?

REPD records the operator as Abbey Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Turves Solar Farm approved and built?

The application was submitted on 13 May 2011. Permission was granted on 12 April 2012, 11 months later. The site became operational on 19 March 2013, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1171.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode