Gib Lane Solar farm (Extension)

Gib Lane Solar farm (Extension) is operational in Buckinghamshire with a recorded capacity of 5 MW, and has been generating since 2016-03-22.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-22
Solar Photovoltaics
Technology
Haymaker Energy
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2015-07-22
Permission granted2015-10-21
3 months after submission
Operational2016-03-22
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on solar

Buckinghamshire has decided 59 solar farms and approved 90%, taking a median of 3 months. See every solar farm decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Arla Dairy Site
Anaerobic Digestion · Operational
50.8 km
Folly Farm
Solar Photovoltaics · Operational
13.11.4 km
Gib Lane (Aston Clinton solar park)
Solar Photovoltaics · Operational
24.21.9 km
Long Meadow Farm
Solar Photovoltaics · Operational
4.16.4 km
Great Seabrook Farm
Solar Photovoltaics · Operational
56.6 km
Quarrendon Fields
Wind Onshore · Operational
1.57.1 km
Church Farm
Solar Photovoltaics · Operational
6.28.7 km
Bumpers Lane Solar Farm
Battery · Operational
13.313.6 km

How big is Gib Lane Solar farm (Extension)?

Gib Lane Solar farm (Extension) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gib Lane Solar farm (Extension)?

REPD records the operator as Haymaker Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gib Lane Solar farm (Extension) approved and built?

The application was submitted on 2015-07-22. Permission was granted on 2015-10-21, 3 months later. The site became operational on 2016-03-22, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5599.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council