Novarly ParcelRenewable sites

Renewable sitesFour Ashes EfW

Four Ashes EfW

Four Ashes EfW is operational in South Staffordshire with a recorded capacity of 23 MW, and has been generating since 2014-05-14.

23 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-05-14
EfW Incineration
Technology
Veolia
South Staffordshire
Authority
England

Planning and build timeline

Application submitted2010-08-19
Permission granted2011-02-18
6 months after submission
Operational2014-05-14
39 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Barr Farm
Solar Photovoltaics · Operational
1.80.8 km
Rodbaston
Wind Onshore · Operational
43.2 km
Land East of Lawn Lane
Solar Photovoltaics · Operational
54.1 km
Jaguar Land Rover
Solar Photovoltaics · Operational
5.84.8 km
Poplars Anaerobic Digestion Facility (Waste AD)
Anaerobic Digestion · Operational
67.4 km
Wolverhampton EfW
EfW Incineration · Operational
88.6 km
Bowmans Harbour Solar Farm
Solar Photovoltaics · Under Construction
6.99.2 km
Albrighton Solar farm
Solar Photovoltaics · Operational
15.89.8 km

How big is Four Ashes EfW?

Four Ashes EfW has a recorded installed capacity of 23 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Four Ashes EfW?

REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Four Ashes EfW approved and built?

The application was submitted on 2010-08-19. Permission was granted on 2011-02-18, 6 months later. The site became operational on 2014-05-14, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 911.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council