Jaguar Land Rover
Jaguar Land Rover is an operational 5.8 MW solar farm in South Staffordshire, generating since 31 March 2014. Planning permission was granted on 15 August 2014, 3 months after submission. Operator of record: Jaguar Land Rover.
Planning and build timeline
| Application submitted | 15 May 2014 |
| Permission granted | 15 August 2014 3 months after submission |
| Operational | 31 March 2014 |
Screening a site of your own?
South Staffordshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Jaguar Land Rover’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Staffordshire’s record on solar
South Staffordshire has decided 16 solar farms and approved 100%, taking a median of 2.8 months. See every solar farm decision in South Staffordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 0.8 km |
Solar Photovoltaics · Operational | 1.8 | 4.1 km |
EfW Incineration · Operational | 8 | 4.2 km |
EfW Incineration · Operational | 23 | 4.8 km |
Solar Photovoltaics · Under Construction | 6.9 | 5.6 km |
Battery · Operational | — | 7.5 km |
Solar Photovoltaics · Operational | 15.8 | 7.5 km |
Battery · Operational | 2 | 7.8 km |
How big is Jaguar Land Rover?
Jaguar Land Rover has a recorded installed capacity of 5.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Jaguar Land Rover?
REPD records the operator as Jaguar Land Rover. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Jaguar Land Rover approved and built?
The application was submitted on 15 May 2014. Permission was granted on 15 August 2014, 3 months later. The site became operational on 31 March 2014.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1491.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode