Renewable sites › Jaguar Land Rover
Jaguar Land Rover
Jaguar Land Rover is operational in South Staffordshire with a recorded capacity of 5.8 MW, and has been generating since 2014-03-31.
Planning and build timeline
| Application submitted | 2014-05-15 |
| Permission granted | 2014-08-15 3 months after submission |
| Operational | 2014-03-31 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Staffordshire’s record on solar
South Staffordshire has decided 16 solar farms and approved 100%, taking a median of 2.8 months. See every solar farm decision in South Staffordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land East of Lawn Lane Solar Photovoltaics · Operational | 5 | 0.8 km |
Barr Farm Solar Photovoltaics · Operational | 1.8 | 4.1 km |
Wolverhampton EfW EfW Incineration · Operational | 8 | 4.2 km |
Four Ashes EfW EfW Incineration · Operational | 23 | 4.8 km |
Bowmans Harbour Solar Farm Solar Photovoltaics · Under Construction | 6.9 | 5.6 km |
Albrighton Solar farm Solar Photovoltaics · Operational | 15.8 | 7.5 km |
Albrighton Solar farm Battery · Operational | — | 7.5 km |
EPSRC Willenhall Battery · Operational | 2 | 7.8 km |
How big is Jaguar Land Rover?
Jaguar Land Rover has a recorded installed capacity of 5.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Jaguar Land Rover?
REPD records the operator as Jaguar Land Rover. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Jaguar Land Rover approved and built?
The application was submitted on 2014-05-15. Permission was granted on 2014-08-15, 3 months later. The site became operational on 2014-03-31.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1491.