Albrighton Solar farm

Albrighton Solar farm is operational in Shropshire, and has been generating since 2019-02-01.

Capacity
as recorded in REPD
Operational
Status
since 2019-02-01
Battery
Technology
Big60Million/Belectric
Shropshire
Authority
England

Planning and build timeline

Application submitted2015-12-04
Permission granted2015-12-14
0 months after submission
Operational2019-02-01
38 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Shropshire’s record on battery storage

Shropshire has decided 15 battery storage schemes and approved 100%, taking a median of 3.8 months. See every battery storage scheme decision in Shropshire

Other built sites within 15 km

SiteMWDistance
Albrighton Solar farm
Solar Photovoltaics · Operational
15.80 km
Pepperhill Solar Farm - Solar Farm & Battery Storage
Battery · Operational
2.8 km
Pepperhill Solar Farm - Solar Farm & Battery Storage
Solar Photovoltaics · Operational
232.8 km
Land East of Lawn Lane
Solar Photovoltaics · Operational
57.4 km
Jaguar Land Rover
Solar Photovoltaics · Operational
5.87.5 km
Barr Farm
Solar Photovoltaics · Operational
1.89 km
Wolverhampton EfW
EfW Incineration · Operational
89.7 km
Four Ashes EfW
EfW Incineration · Operational
239.8 km

How big is Albrighton Solar farm?

REPD does not record an installed capacity for Albrighton Solar farm.

Who operates Albrighton Solar farm?

REPD records the operator as Big60Million/Belectric. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Albrighton Solar farm approved and built?

The application was submitted on 2015-12-04. Permission was granted on 2015-12-14, 0 months later. The site became operational on 2019-02-01, 38 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6875.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council