Renewable sitesBarr Farm

Barr Farm

Barr Farm is operational in South Staffordshire with a recorded capacity of 1.8 MW, and has been generating since 2015-04-01.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-04-01
Solar Photovoltaics
Technology
Lark Energy
South Staffordshire
Authority
England

Planning and build timeline

Application submitted2014-06-04
Permission granted2014-08-19
2 months after submission
Operational2015-04-01
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Staffordshire’s record on solar

South Staffordshire has decided 16 solar farms and approved 100%, taking a median of 2.8 months. See every solar farm decision in South Staffordshire

Other built sites within 15 km

SiteMWDistance
Four Ashes EfW
EfW Incineration · Operational
230.8 km
Land East of Lawn Lane
Solar Photovoltaics · Operational
53.3 km
Rodbaston
Wind Onshore · Operational
43.8 km
Jaguar Land Rover
Solar Photovoltaics · Operational
5.84.1 km
Wolverhampton EfW
EfW Incineration · Operational
88 km
Poplars Anaerobic Digestion Facility (Waste AD)
Anaerobic Digestion · Operational
68.1 km
Bowmans Harbour Solar Farm
Solar Photovoltaics · Under Construction
6.98.8 km
Albrighton Solar farm
Solar Photovoltaics · Operational
15.89 km

How big is Barr Farm?

Barr Farm has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Barr Farm?

REPD records the operator as Lark Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Barr Farm approved and built?

The application was submitted on 2014-06-04. Permission was granted on 2014-08-19, 2 months later. The site became operational on 2015-04-01, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2178.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council